You don't have javascript enabled. Good luck with that.
Pencarian
Petugas Gabungan Pemkot Jakpus Gelar Penertiban PMkS - PKL di Tiga Lokasi

Four Roads in Central Jakarta will Be Equipped with Water Pumps

Central Jakarta Water Reservoir (SDA) Sub-agency will install 5 water pumps on 4 roads that often inundated when heavy rain falls.

We will install pumps with capacity 250 liters per second

Central Jakarta SDA Sub-agency's Development and Drainage Improvement Section Head, Maman Supraman stated, his side will install water pumps on Jalan Mangga Besar XIII, Jalan Industri, Jalan Rajawali Selatan, and Jalan Jati Pinggir II.

According to him, those roads are often inundated when the rain falls because it is located in the lowland area.

SDA Sub-Agency Adds Four Mobile Pumps to Face Rainy Season

"We will install pumps with capacity 250 liters per second," he added, Thursday (1/7).

Currently, two pumps are being installed on Jalan Mangga Besar XIII. While pumps for three other locations are still being shipped from abroad.

"We target its installation to finish in January to overcome inundation that often occurs," he asserted.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1083 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye518 personDessy Suciati
  3. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye468 personBudhi Firmansyah Surapati
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye468 personAldi Geri Lumban Tobing
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye439 personNurito